Floor screed costs
During the development of any building, the application of floor screed is one of the most important stages of laying a new floor. Screed is a mixture of sand, water, cement and other sand-based aggregates, which helps create a sturdy, even layer of flooring – a perfect base for any flooring finish.
The factors that should be considered when pricing a floor screed project include:
- Type of screed used.
- Quality of the screed.
- Depth of screed required.
- Overall size of the floor.
- Accessibility.
- Drying and trafficking time of the screed.
- How many people are working on the project.
- Geographic location.
Due to these factors, it can be difficult to get an exact figure from an online calculator. However, while there are many variables, it helps to have a general figure to use when planning a project:
- Traditional screed costs between £11 and £14 per square metre, based on a thickness of 75mm covering 125 square metres per day.
- Flow screed costs between £10 and £16 per square metre, based on a thickness of 50mm covering up to 1,500 square metres daily.
To obtain an exact quotation for your floor screed project, it’s best to contact a professional for a quote.
--Ukscreedsrender 12:31, 29 Nov 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA welcomes plans to strengthen subcontractor quality control.
Combining mid-career qualifications with experience broadens career opportunities.
Why being a mentor can help your career.
Channel 4 broadcaster to host 125th anniversary ceremony.
Listed structures on the rail network
Heritage interests and operational requirements must be balanced.
Historic England publishes research into embodied carbon when retrofitting traditional buildings.
New Prime Minister delivers on ECA call for cut in electricity costs.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.

















